Check Out Our Latest Projects

Retailer Dock Replacement

Client

Our client, a leading grocery retailer, faced significant downtime due to outdated equipment. We provided a comprehensive upgrade to their machinery, enhancing productivity and reliability.

Date

Completed: SEPTEMBER 2024

My Role

Logistics & Transportation
In this project, we tackled the challenge of modernizing a fleet of dock levellers. Our team implemented state-of-the-art technology to improve load handling efficiency and safety. The result was a 30% increase in operational throughput and a marked reduction in maintenance costs.

Front Kerb Angle Blowout

Capstone "G Series" Dock Leveller

Client

Front Kerb Angle Blow occurs when the dock leveller pit fails under the pressure of the working dock leveller. Some dock levellers on the Austtralian market are designed in such a way that their load force is greatest at the front of the dock leveller, this places extreme pressure on the front kerb angle and can lead to front kerb angle blow (as pictured below).

Date

Completed: FEBUARY 2025

My Role

Logistics & Transportation

Capstone’s design engineers have spend considerable time reviewing issues experienced  by customers with their docking equipment. Adding this information to the feedback provided by our highly experienced field service team, our engineers developed our “G Series” range which is the next generation in dock levellers. Capstone’s “G Series” Dock leveller is designed transfer operational forces away from the front of dock leveller preventing damage to the front of the dock pit.

McNab Brisbane

Capstone Goods Hoist

Client

This fully self-supported hoist serves two levels, with a capacity of 3000kgs.
Finished in a full mesh exterior in customer colors, this hoist is built to serve, but it will do it in style.

Fully designed and manufactured in Australia.

Date

Completed: AUGUST 2024

My Role

Logistics & Transportation

Leading Retail Supermarket

Newcombe

Client

Capstone Industries recently completed a successful dock leveller installation at Woolworths Newcombe, enhancing the efficiency and safety of their loading operations. The project involved the installation of a new hydraulic dock leveller designed for heavy-duty performance and durability.

Date

Completed: March 2025

My Role

Logistics & Transportation

Our expert team managed the entire process, from precision engineering and manufacturing to on-site installation and testing, ensuring minimal disruption to Woolworths’ operations. The new system offers improved load handling capabilities and compliance with Australian safety standards.

Cherry Hill Orchard

Dock Leveller, Frame & Igloo

Client

Capstone Industries delivered a fully integrated dock leveller, frame, and igloo system for Cherry Hill Orchard, supporting their temperature-sensitive logistics and streamlining their loading operations.

This tailored solution featured the installation of a high-performance dock leveller with a fully enclosed insulated igloo structure, designed to maintain cold chain integrity and protect goods from exposure during loading and unloading. The robust frame and custom-engineered components ensured durability, thermal efficiency, and operational reliability.

Date

Completed: January 2025

My Role

Logistics & Transportation

From initial design consultation through to fabrication, installation, and final commissioning, our team ensured precise execution with minimal disruption to site operations. The system enhances safety, improves workflow efficiency, and aligns with industry best practices in produce handling and post-harvest logistics

Leading Retail Supermarket

Dock Leveller, Universal Control Panel & Compress

Client

Capstone Industries recently completed a successful dock leveller installation at Woolworths Newcombe, enhancing the efficiency and safety of their loading operations. The project involved the installation of a new hydraulic dock leveller designed for heavy-duty performance and durability.

Date

Completed: March 2025

My Role

Logistics & Transportation

Our expert team managed the entire process, from precision engineering and manufacturing to on-site installation and testing, ensuring minimal disruption to Woolworths’ operations. The new system offers improved load handling capabilities and compliance with Australian safety standards.

Toll Web Dock

Dock Leveller & Universal Control Panel

Client

Capstone Industries successfully delivered a custom dock leveller and universal control panel installation for Toll Group at their Web Dock facility. This project played a key role in optimising logistics efficiency and enhancing the safety of dock operations at the site.

Date

Completed: May 2025

My Role

Logistics & Transportation

The scope of work involved the installation of a heavy-duty hydraulic dock leveller and the integration of a universal control panel tailored for streamlined operations. Designed for robust performance and long-term reliability, this upgrade supports Toll’s high-volume freight handling requirements.

Leading Retail Supermarket

Scissor Lift Table

Client

We were pleased to be engaged by Construction Control to supply a retail scissor lift table for a retail supermarket development project in Canberra.

Date

Completed: JULY 2023

My Role

Logistics & Transportation
In this project, we tackled the challenge of modernizing a fleet of dock levellers. Our team implemented state-of-the-art technology to improve load handling efficiency and safety. The result was a 30% increase in operational throughput and a marked reduction in maintenance costs.

Project Gallery

Art Museum

Client

We were pleased to be engaged by Kane Construction to supply a scissor lift table for a prominent Art Museum, that features a new five-storey building housing a museum, visitor centre, arts gallery and studio located in the regional city of Shepparton, Victoria.

Date

Completed: March 2023

My Role

Logistics & Transportation
In this project, we tackled the challenge of modernizing a fleet of dock levellers. Our team implemented state-of-the-art technology to improve load handling efficiency and safety. The result was a 30% increase in operational throughput and a marked reduction in maintenance costs.

Get A Quote

Our expert team will assess your needs, provide transparent pricing, and guide you through the best solutions for your business. Let us help you get started with confidence and peace of mind.

Call - 1300 247 786