Check Out Our Latest Projects
Retailer Dock Replacement

Client
Our client, a leading grocery retailer, faced significant downtime due to outdated equipment. We provided a comprehensive upgrade to their machinery, enhancing productivity and reliability.
Date
Completed: SEPTEMBER 2024
My Role
Front Kerb Angle Blowout
Capstone "G Series" Dock Leveller
Client
Front Kerb Angle Blow occurs when the dock leveller pit fails under the pressure of the working dock leveller. Some dock levellers on the Austtralian market are designed in such a way that their load force is greatest at the front of the dock leveller, this places extreme pressure on the front kerb angle and can lead to front kerb angle blow (as pictured below).
Date
Completed: FEBUARY 2025
My Role
Capstone’s design engineers have spend considerable time reviewing issues experienced by customers with their docking equipment. Adding this information to the feedback provided by our highly experienced field service team, our engineers developed our “G Series” range which is the next generation in dock levellers. Capstone’s “G Series” Dock leveller is designed transfer operational forces away from the front of dock leveller preventing damage to the front of the dock pit.
McNab Brisbane
Capstone Goods Hoist
Client
This fully self-supported hoist serves two levels, with a capacity of 3000kgs.
Finished in a full mesh exterior in customer colors, this hoist is built to serve, but it will do it in style.
Fully designed and manufactured in Australia.
Date
Completed: AUGUST 2024
My Role
Leading Retail Supermarket
Newcombe
Client
Capstone Industries recently completed a successful dock leveller installation at Woolworths Newcombe, enhancing the efficiency and safety of their loading operations. The project involved the installation of a new hydraulic dock leveller designed for heavy-duty performance and durability.
Date
Completed: March 2025
My Role
Our expert team managed the entire process, from precision engineering and manufacturing to on-site installation and testing, ensuring minimal disruption to Woolworths’ operations. The new system offers improved load handling capabilities and compliance with Australian safety standards.
Cherry Hill Orchard
Dock Leveller, Frame & Igloo
Client
Capstone Industries delivered a fully integrated dock leveller, frame, and igloo system for Cherry Hill Orchard, supporting their temperature-sensitive logistics and streamlining their loading operations.
This tailored solution featured the installation of a high-performance dock leveller with a fully enclosed insulated igloo structure, designed to maintain cold chain integrity and protect goods from exposure during loading and unloading. The robust frame and custom-engineered components ensured durability, thermal efficiency, and operational reliability.
Date
Completed: January 2025
My Role
From initial design consultation through to fabrication, installation, and final commissioning, our team ensured precise execution with minimal disruption to site operations. The system enhances safety, improves workflow efficiency, and aligns with industry best practices in produce handling and post-harvest logistics
Leading Retail Supermarket
Dock Leveller, Universal Control Panel & Compress
Client
Capstone Industries recently completed a successful dock leveller installation at Woolworths Newcombe, enhancing the efficiency and safety of their loading operations. The project involved the installation of a new hydraulic dock leveller designed for heavy-duty performance and durability.
Date
Completed: March 2025
My Role
Our expert team managed the entire process, from precision engineering and manufacturing to on-site installation and testing, ensuring minimal disruption to Woolworths’ operations. The new system offers improved load handling capabilities and compliance with Australian safety standards.
Toll Web Dock
Dock Leveller & Universal Control Panel
Client
Capstone Industries successfully delivered a custom dock leveller and universal control panel installation for Toll Group at their Web Dock facility. This project played a key role in optimising logistics efficiency and enhancing the safety of dock operations at the site.
Date
Completed: May 2025
My Role
The scope of work involved the installation of a heavy-duty hydraulic dock leveller and the integration of a universal control panel tailored for streamlined operations. Designed for robust performance and long-term reliability, this upgrade supports Toll’s high-volume freight handling requirements.
Leading Retail Supermarket
Scissor Lift Table
Client
We were pleased to be engaged by Construction Control to supply a retail scissor lift table for a retail supermarket development project in Canberra.
Date
Completed: JULY 2023
My Role
Project Gallery
Art Museum
Client
We were pleased to be engaged by Kane Construction to supply a scissor lift table for a prominent Art Museum, that features a new five-storey building housing a museum, visitor centre, arts gallery and studio located in the regional city of Shepparton, Victoria.
Date
My Role
Get A Quote
Our expert team will assess your needs, provide transparent pricing, and guide you through the best solutions for your business. Let us help you get started with confidence and peace of mind.
